Building a traditional Accessory Dwelling Unit (ADU) typically takes 10 to 18 months from start to finish. The timeline depends on the complexity of the design, permitting requirements, and site conditions. Here’s how the process generally breaks down:
Design Phase:
The design process takes approximately 3 to 4 months and includes creating architectural plans and the construction documents required for permitting. More complex designs or challenging site conditions can extend this timeline.
Permitting Phase:
Permitting can take 3 to 8 months, depending on the city’s approval process, local jurisdiction requirements, and potential additional reviews from homeowners associations (HOAs) or coastal authorities.
Construction Phase:
Traditional on-site construction typically takes 5 to 7 months. Factors like weather, site conditions, and subcontractor availability can further extend this timeline.
Common Delays in Traditional ADU Construction
Several factors contribute to extended timelines, including:
- Lengthy city permitting and review processes
- Additional approvals required for coastal zones or HOAs
- Utility upgrades, such as sewer or electrical system enhancements
- Material shortages and supply chain delays
- Weather-related interruptions
- Design revisions and plan resubmissions
These factors often create a domino effect, delaying each subsequent phase of the project.
The Connest Modular Advantage
At Connest, we believe that building an ADU shouldn’t take over a year. Our modular construction process significantly reduces build time, offering move-in ready ADUs in as little as 12 weeks with our Fast-Track Program.
Why is Connest faster?
Pre-Approved and Certified:
Our modular ADUs are pre-approved, HCD-certified, and Title 24 compliant, which eliminates months of permitting delays.
Off-Site Manufacturing:
While your site is being prepared, we manufacture your ADU in our controlled facility. This parallel process drastically cuts down the total timeline.
Weather-Resistant Production:
Factory construction prevents weather-related delays that often slow traditional builds.
Rapid Installation:
Our plug-and-play system allows us to complete on-site installation in a matter of days, not months.
Streamlined Permitting Support:
We manage the permitting process, ensuring faster approvals and minimal back-and-forth with city officials.
The Result:
With Connest, you can move into your ADU three times faster than with traditional construction, without sacrificing quality or safety.